Cabopino, Marbella East · W-047M5C

Brand-New Luxury Villa Under Construction with Stunning Views

€4,275,000
  • Beds 5
  • Baths 5
  • Interior 670 m²
  • Built 670 m²
  • Terrace 84 m²
  • Plot 1,200 m²
Request more information
Amenities and special features of this property

This luxury villa, currently under construction and scheduled for completion in June 2027, boasts a total built area of 670 m² and features five spacious en-suite bedrooms, each designed to offer the highest levels of privacy, comfort and elegance. The layout is thoughtfully planned: one bedroom is situated in the basement, another on the ground floor, and three on the first floor, where panoramic sea and golf course views create an extraordinary living experience.

The basement level includes a versatile multi-purpose room—ideal for use as a home cinema, private gym or entertainment area—as well as a separate laundry room and secure private parking.

On the ground floor, an elegant entrance hall leads to a guest toilet, an en-suite bedroom and a generous open-plan living space. This area combines the living room, dining room and a fully equipped modern kitchen with high-end appliances, creating an inviting environment for both everyday living and entertaining.

The first floor offers a bright landing that connects to three en-suite bedrooms, each filled with natural light and oriented towards the property’s most impressive views.

One of the villa’s standout features is the spectacular solarium, a private rooftop retreat equipped with a jacuzzi and a premium outdoor kitchen. It is the perfect setting to enjoy the Mediterranean climate, host outdoor gatherings or relax while admiring unforgettable 360º sunset views.

Outside, the villa provides an atmosphere of total tranquillity. The outdoor area includes a large saltwater swimming pool, beautifully landscaped gardens and a spacious terrace ideal for family moments, entertaining or peaceful relaxation.

This exceptional property is also equipped with state-of-the-art home technology, ensuring convenience, efficiency and modern luxury throughout.

Request a private viewing and experience this exceptional villa.

Listing Details

  • Basement
  • Close to golf
  • Fireplace
  • Front line golf
  • Golf view
  • Mountain view
  • Sea view
  • Solarium
  • Underfloor heating (throughout)

Sale price does not include costs or taxes. Additional costs for the buyer: inscription and notary fees, ITP 7% or, alternatively 10% VAT and AJD 1.2% on the purchase price) on new properties and subject to some requisites to be met. This info is subject to errors, omissions, modifications, prior sale or withdrawal from the market. Information sheet available, Decree 218/2005 Oct. 11th.

Get in touch for more details about this property
  • Beds 5
  • Baths 5
  • Interior 670 m²
  • Built 670 m²
  • Terrace 84 m²
  • Plot 1,200 m²
Responsible Shop Engel & Völkers Elviria Get directions +34 952 83 55 80
Name Required
Email Required
Phone Required
Required field
Property Contact Image

Read more about the area

Cabopino

Cabopino is a delightful coastal area nestled in the eastern part of Marbella, located in the province of Málaga on the Costa del Sol. Renowned for its pristine beaches – In fact, The Artola-Cabopino beach is considered one of the best and most unspoilt beaches on the Costa del Sol and its Dunas de Artola is a natural monument approved in 2001 , which lies on a 1200 m plot of land-, delightful marina, and luxurious amenities, Cabopino is a preferred destination for tourists and expats seeking a refined lifestyle on the Costa del Sol.

Cabopino sunset on the beach

Similar Properties for sale in Cabopino and Marbella East and Marbella (All areas)

You might also like

More properties for sale in Cabopino, Marbella East, Marbella (All areas)

Discover the latest properties that have come on the market in marbella

New listings